Subdivision projects
Mt Darragh Subdivision – Pambula
Client: Bobbins
Date/Duration:
Description:
Site Clearing, Topsoil Removal, Earthworks, Roads, Kerb & Gutter, Storm water Pipe & Pits & Electrical Services.
Mirador Estate – Stage 10
Client: R C L Merimbula Pty Ltd
Date/Duration: November 2018 – May 2019
Description: Construction of a 36 lot subdivision including:
• Clearing and grubbing
• Stripping Topsoil
• Bulk and detailed earthworks
• Stormwater Reticulation
• Water Reticulation
• Sewer Reticulation
• Electrical Reticulation
• Kerb and Gutter
• Concrete Pavements and footpaths
• Roadworks including hot bitumen seal, signs and linemarking
• Replacing topsoil and Site remediation
Lakewood Drive Subdivision Merimbula
Client: Brittons
Date/Duration: October 2017 – October 2018
Description:
- Clearing and grubbing
- Bulk earthworks
- Detailed earthworks
- Kerb and gutter
- Roadworks
- Sealing of road
- Water reticulation
- Storm water reticulation
- Comms reticulation
- Electrical reticulation
Mirador Estate- Stage 11 & 12
Client: R C L Merimbula Pty Ltd
Date/Duration: June 2017 – October 2017
Description:
- Clearing and grubbing
- Bulk earthworks
- Detailed earthworks
- Roadworks
- Sealing of road
- Storm water reticulation
- Comms reticulation
- Electrical reticulation
Spanish Oaks Subdivision Bega
Cullendulla Drive Subdivision
Client: R D Miller
Date/Duration: December 2017 – March 2018
Description:
- Detailed Earthworks
- Storm water reticulation
- Concrete form work
- Comms reticulation
- Electrical reticulation
Bellbird Estate Merimbula
Client: R D Miller
Date/Duration:
Description:
- Bulk earthworks
- Roadworks
- Services – sewer, water, power
- Construction of stormwater drainage
- Construction of stormwater controls per Stormwater Management Plan
- Rehabilitate and seed site
Bay Ridge Estate – Multi Staged Subdivision
Client: CIC (Canberra Investment Corporation)
Date/Duration: Multi-Staged Project between 2009 & 2016
RDM contract value: $7.8m
Description: Construction of a green field 40 lot subdivision on the north side of Batemans Bay.
- Road construction – 10,000m2
- Earthworks – 20,000m3
- Stormwater – 3km
- Services infrastructure – power, water, – 4km
Glen Mia Estate
Client: CIC (Canberra Investment Corporation)
Date/Duration: 2008 – 12 months
RDM contract value: $8m
Description:
Construction of 60-lot subdivision on the edge of Bega CBD.
All earthworks, Roadworks, Driveways, Rehabilitation of site.