Subdivisions

Subdivision projects

 

Mt Darragh Subdivision – Pambula 

Client: Bobbins 

Date/Duration:

Description:

Site Clearing, Topsoil Removal, Earthworks, Roads, Kerb & Gutter, Storm water Pipe & Pits & Electrical Services. 


Mirador Estate – Stage 10

Client: R C L Merimbula Pty Ltd

Date/Duration: November 2018 – May 2019

Description: Construction of a 36 lot subdivision including:
• Clearing and grubbing
• Stripping Topsoil
• Bulk and detailed earthworks
• Stormwater Reticulation
• Water Reticulation
• Sewer Reticulation
• Electrical Reticulation
• Kerb and Gutter
• Concrete Pavements and footpaths
• Roadworks including hot bitumen seal, signs and linemarking
• Replacing topsoil and Site remediation


Lakewood Drive Subdivision Merimbula

Client:  Brittons 

Date/Duration: October 2017 – October 2018

Description:

  • Clearing and grubbing
  • Bulk earthworks
  • Detailed earthworks 
  • Kerb and gutter 
  • Roadworks
  • Sealing of road
  • Water reticulation
  • Storm water reticulation
  • Comms reticulation
  • Electrical reticulation

Mirador Estate- Stage 11 & 12

Client: R C L Merimbula Pty Ltd

Date/Duration: June 2017 – October 2017

Description:

  • Clearing and grubbing
  • Bulk earthworks
  • Detailed earthworks 
  • Roadworks
  • Sealing of road
  • Storm water reticulation
  • Comms reticulation
  • Electrical reticulation

Spanish Oaks Subdivision Bega

 
Client: R D Miller
 
Date/Duration: November 2016 – June 2017
 
Description:
 
Bulk earthworks, Tree removal, Establish/seal road, Driveways, Pipe works, Construction of dams.

 


Cullendulla Drive Subdivision 

Client: R D Miller

Date/Duration: December 2017 – March 2018

Description:

  • Detailed Earthworks
  • Storm water reticulation
  • Concrete form work
  • Comms reticulation
  • Electrical reticulation

Bellbird Estate Merimbula

Client: R D Miller

Date/Duration:

Description:

  • Bulk earthworks
  • Roadworks
  • Services – sewer, water, power
  • Construction of stormwater drainage
  • Construction of stormwater controls per Stormwater Management Plan
  • Rehabilitate and seed site

 


Bay Ridge Estate – Multi Staged Subdivision

Client: CIC (Canberra Investment Corporation)

Date/Duration: Multi-Staged Project between 2009 & 2016

RDM contract value: $7.8m

Description: Construction of a green field 40 lot subdivision on the north side of Batemans Bay.

  • Road construction – 10,000m2
  • Earthworks – 20,000m3
  • Stormwater – 3km
  • Services infrastructure – power, water, – 4km


Glen Mia Estate

Client: CIC (Canberra Investment Corporation)

Date/Duration: 2008 – 12 months

RDM contract value: $8m

Description:

Construction of 60-lot subdivision on the edge of Bega CBD.

All earthworks, Roadworks, Driveways, Rehabilitation of site.