Notice: Function wp_enqueue_style was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the cfwccss handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/rdmillercom/public_html/wp-includes/functions.php on line 5865

Notice: Function is_feed was called incorrectly. Conditional query tags do not work before the query is run. Before then, they always return false. Please see Debugging in WordPress for more information. (This message was added in version 3.1.0.) in /home/rdmillercom/public_html/wp-includes/functions.php on line 5865
Water Infrastructure – RD Miller Earthmoving and Excavations

Water Infrastructure


Ravenswood Street Water main Renewal 

Client: Bega Valley Shire Council

Date/Duration:

Description: Upgrade 500m of existing 100mm water main. Renewed all service lines to house boundaries. Chlorinated, disinfected and reconnected to existing mains.


 Bega Cheese Sewer

Client: Bega Cheese Limited

Date/Duration:

Description: Renewed two sewer pump stations. Renewed 150m of rising main.


ESC Preddeys Wharf Sewer & Water main 

Client: Eurobodalla Shire Council 

Date/Duration:

Description: Underbored 400m of HDPE pipe. Upgraded existing connections.


SMRC Watermain Replacement 

Client: Snowy Mountains Regional Council 

Date/Duration:

Description: Upgrade and replacement of existing water mains in Bombala, Jindabyne and Cooma. Renewed all service lines to house boundaries. Chlorinated, disinfected and reconnected to existing mains.



Lake Wallace – Earth Dam & Road Construction

Client: NSW Public Works

Date/Duration: 2015/2016 – 52 weeks

RDM contract value: $3.8m

Description: Construction of a new clay core earth dam and associated infrastructure and road works. Wall height – 12m. Dam volume 380ML.


Burinjuck Sewer Upgrade 

Client: New South Wales Crown Holiday Parks Trust 

Date/Duration:

Description: 

  • Excavation
  • Repair pavement/surfaces
  • Pump Stations
  • Sewer reticulation
  • water reticulation
  • fire system reticulation
  • Absorption trench 
  • Effluent storage tank 
  • Electrical 

Brou & Mourya Wate Facility 

Client: Eurobodalla Shire Council 

Date/Duration:

Description: Bulk earthworks for additional landfill capacity at Brou before the existing landfill reaches its capacity by construction of a new land fill cell.

  • Excavation works
  • HDPE liner 
  • Leachate pipework
  • Road works
  • Rockfall netting

Bega Valley Sewerage Program

Client: Bega Valley Shire Council

Date/Duration: 2004-2008 – 5 years

RDM contract value: $10m

Description: Construction of multiple new MBR sewerage treatment plants, upgrades to existing sewerage treatment plants (STPs) as well as pump stations and pipelines.

  • Four new MBR STPs. All civil works, concrete tanks, in ground pipeworks, roads and pavements
  • New 20ML HDPE lined effluent storage pond at Tathra STP
  • Upgrade to Tathra STP
  • Upgrade to Merimbula STP including new 30ML storage pond
  • New pump stations and rising mains at Kalaru, Merimbula and Bega

Water Mains Renewal

Client: Bega Valley Shire Council

Date/Duration: 2005-2011 – 6 years

RDM contract value: $5m

Description: Installation of new water mains throughout the Bega Valley Shire as part of the capital works program. All aspects of water main installation in brown field sites.


Water Mains Renewal

Client: Bega Valley Shire Council

Date/Duration: 2013/15 – 2 years

RDM contract value: $2m

Description: Installation of new water mains throughout the Bega Valley Shire as part of the capital works program. All aspects of water mains installation in brown field sites.


Water Mains Renewal

Client: Bega Valley Shire Council

Date/Duration: 2015/16 – 12 months

RDM contract value: $2m

Description: Installation of new water mains throughout the Bega Valley Shire as part of the capital works program. All aspects of water main installation in brown field sites.


Bega Hospital Sewerage Pump Station

Client: Bega Valley Shire Council / Health Infrastructure

Date/Duration: 2015 – 4 months

RDM contract value: $1.2m

Description: Construction of a new sewerage pump station and rising main for the new Bega Hospital as well as an adjacent subdivision.