Notice: Function wp_enqueue_style was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the cfwccss handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/rdmillercom/public_html/wp-includes/functions.php on line 5865

Notice: Function is_feed was called incorrectly. Conditional query tags do not work before the query is run. Before then, they always return false. Please see Debugging in WordPress for more information. (This message was added in version 3.1.0.) in /home/rdmillercom/public_html/wp-includes/functions.php on line 5865
Jason – RD Miller Earthmoving and Excavations

Bridge Replacements

Client: Snowy Monaro Regional Council

Date/Duration: 2018 (Current)

RDM contract value: $160,000

Description: RDM was contracted to replace the bridges at Jones Creek on Merima Road, Bombala and Horsey Swamp on Tantawangalo Road, Cathcart. The works included the construction of bypass road, removal of the old wooden bridges, excavation and construction of bored piles and foundations, placement of InQuick Bridge abutment, placement of InQuick Deck and backfill and construction of approach road.

20180803_093643 small

20180503_075636 small20180803_091246 small

20180426_105237 small

 

 

Posted in Uncategorised

Surf Beach Waste Management Facility

Client: Eurobodalla Shire Council

Date/Duration: 2017 – 2018 (Current)

RDM contract value: $3.7m

Description: This facility provides the ESC with additional waste disposal capacity for the next 5 to 7 years. The works involved the excavation, shaping and lining of the large landfill cell , a lined leachate storage pond, a stormwater retention pond and all associated pipework. The works included fencing, landscaping and shaping of the site to obtain a high standard of finish. The works were completed with no significant reportable safety incidents, no lost LTIs, and no environmental incidents. The quality of the work was high, especially in relation to the liner installation, which meets strict EPA guidelines.

Last liner went in at 12.15. 17218 (small) Surfbeach WMF 010518 2 (small) Leachate pipe in cell. 20418 (small)

Surf Beach WMF

Posted in Uncategorised

North Bega Sewerage Scheme

Client: Bega Valley Shire Council

Date/Duration: 2017 – 2018

RDM contract value: $2.2m

Description: Construction of pump station, rising main and transfer main

North Bega Sewer SchemeNorth Bega Sewer SchemeNorth Bega Sewer Scheme

Posted in Uncategorised

Bega Valley Shire Council Gravel Road Resheeting

Client: Bega Valley Shire Council

Date/Duration: 2016 – Current

RDM contract value: $1.3m

Description: Resheet the flood-damaged gravel roads across the Bega Valley Shire including repair of culverts and reforming of drains. Rock retaining walls have been formed to support the roads when required.

Posted in Uncategorised

Bega Bypass

Client: John Holland / RMS

Date/Duration: 2012 / 2013 – 18 months

RDM contract value: $5m

Description: RDM subcontracted directly to John Holland for a large portion of the bulk earthworks, 4 km Bega Bypass / Princess Hwy project. RDM had up to 20 pieces of plant and equipment onsite at any one time. Including – D8 and D6 dozers, 11 pad foot & smooth drum rollers, 3 water carts, Grader, 25T & 30T dump trucks, 2 truck & dogs, 2 x 30T excavators, 5T excavator, Tub grinder.

RDM also undertook large portions of the concrete kerbing works and concrete pavement works.

Posted in Uncategorised

Glen Mia Estate

Client: CIC (Canberra Investment Corporation)

Date/Duration: 2008 – 12 months

RDM contract value: $8m

Description: Construction of a green field 60-lot subdivision on the edge of Bega CBD.

Posted in Uncategorised

Bay Ridge Estate – Multi Staged Subdivision

Client: CIC (Canberra Investment Corporation)

Date/Duration: Multi-Staged Project between 2009 & 2016

RDM contract value: $7.8m

Description: Construction of a green field 60 lot subdivision on the north side of Batemans Bay.

  • Road construction – 10,000m2
  • Earthworks – 20,000m3
  • Stormwater – 3km
  • Services infrastructure – power, water, – 4km
Posted in Uncategorised

Bega Hospital Sewerage Pump Station

Client: Bega Valley Shire Council / Health Infrastructure

Date/Duration: 2015 – 4 months

RDM contract value: $1.2m

Description: Construction of a new sewerage pump station and rising main for the new Bega Hospital as well as an adjacent subdivision.

Posted in Uncategorised

BVSC Water Mains Renewal

Client: Bega Valley Shire Council

Date/Duration: 2012/17 – 5 years

RDM contract value: $8m

Description: Installation of new water mains throughout the Bega Valley Shire as part of the capital works program. All aspects of water main installation in brown field sites.

Posted in Uncategorised

Bega Valley Sewerage Program

Client: Bega Valley Shire Council

Date/Duration: 2004-2008 – 5 years

RDM contract value: $10m

Description: Construction of multiple new MBR sewerage treatment plants, upgrades to existing sewerage treatment plants (STPs) as well as pump stations and pipelines.

Summary:

  • Four new MBR STPs. All civil works, concrete tanks, in ground pipeworks, roads and pavements
  • New 20ML HDPE lined effluent storage pond at Tathra STP
  • Upgrade to Tathra STP
  • Upgrade to Merimbula STP including new 30ML storage pond
  • New pump stations and rising mains at Kalaru, Merimbula and Bega
Posted in Uncategorised

Lake Wallace – Earth Dam & Road Construction

Client: NSW Public Works & Cooma Monaro Shire Council

Date/Duration: 2015/2016 – 52 weeks

RDM contract value: $3.8m

Description: Construction of a new clay core earth dam and associated infrastructure and road works. Wall height – 12m. Dam volume 380ML.

Posted in Uncategorised

Jindabyne Sewage Treatment Plant Upgrade

Client: Snowy Shire Council / Public Works

Date/Duration: 2012 – 10 months

RDM contract value: $3.5m

Description: Upgrade to Jindabyne sewerage treatment plant inlet works, pipes and chemical dosing system. Construction of a new pump station and overflow storage tank on the edge of Jindabyne Lake. Electrical upgrade to Tyrolean village sewerage pump station.

Posted in Uncategorised

Littleton Gardens, Stages 1 – 5

Client: Bega Valley Shire Council

Date/Duration: 2013/16 – 36 months

RDM contract value: $3.5m

Description:

  • Major redevelopment of the central parklands in the centre of Bega.
  • Demolition of existing carparks, footpaths, landscaping.
  • Installation of new roads, carparks, footpaths and landscaping including furniture.
Posted in Uncategorised

Brou and Moruya Landfills

Client: Eurobodalla Shire Council / Public Works

Date/Duration: 2012/13 – 52 weeks

RDM contract value: $2m

Description:
Specialised earthworks scope included:

  • Detailed & Bulk Earthworks: 30,000m3
  • Road works: 1000m2
  • Pavement construction: 1000m2
  • 2mm HDPE liner for the waste cell – 4000m2
Posted in Uncategorised

South East Regional Hospital

Client: Brookfield Multiplex

Date/Duration: 2014/15 – 90 weeks

Contract value: $8.1m

Description: RDM was subcontracted directly to perform structural concrete, stormwater and road construction works.

RDM’s scope included:

  • Bulk & detailed earthworks
  • All footings for slab on ground including lift wells, stair bases etc
  • Slab on ground construction (10,000m2)
  • Stormwater pipe & pits
  • Road & car park works
  • Landscaping
Posted in Uncategorised

Bega-Cooma Transmission Line

begacoomatransmission1Client: Essential Energy/ GHD (Superintendent), Essential Energy Major Projects (Wagga Wagga)

Date/Duration: 2012/13 – 52 weeks

RDM contract value: $6m

Description: Specialised earthworks scope included installation of 350 concrete footings with hold down bolts to accommodate the new steel powerline towers.

Posted in Uncategorised